(By Praveen Vyas) Morbi Taluka Congress Committee vice-president and former Taluka Panchayat member Lalit Kasundra has given a written representation to the Morbi District Collector regarding the Ravapar-Ghunda road in Morbi Ward No. 11. The work of Ravapar-Ghunda road has been going on at a snail's pace for the last 1 year. The people of Ravapar village and the surrounding society have been troubled by dust storms and traffic for the last 1 year. For the last 2 months, work has been stopped by digging a side of the road from Indraprastha Partyplot to Vaidehi Plaza. Due to this, vehicles come face to face on the same side for hours. Children going to school in 45-degree heat in the afternoon, children and ordinary citizens get stuck in traffic for hours and children in buses get washed away by the heat. Lalit Kandra said that the state government's Municipal Commissioner R.B.
Residents of Morbi Ward No. 11 Frustrated with Slow Progress on Ravapar-Ghunda Road Project
Akila News•

Full News
Share:
Disclaimer: This content has not been generated, created or edited by Achira News.
Publisher: Akila News
Want to join the conversation?
Download our mobile app to comment, share your thoughts, and interact with other readers.