Union Home Minister Amit Shah on Saturday described the proposed 11,200-MW Siang Upper Multipurpose Project (SUMP) as a national project crucial to Arunachal Pradesh’s development and offered talks and a comprehensive rehabilitation package for affected communities. These were his first public remarks on the project since protests turned violent in Pasighat on October 23. Speaking at the President’s Police Colour award ceremony in Itanagar, Shah said Chief Minister Pema Khandu had briefed him on the situation on Friday. “The Siang project is a national project which is extremely important for the development of Arunachal, the country’s energy security, the state’s budget and income, as well as its strategic interests,” he said. “We will hold positive and constructive discussions,” Shah said. He urged residents to speak to the state government and, through it, to the Union Home Ministry. He said affected communities would receive a comprehensive rehabilitation package and assured them that their heritage, culture and religious beliefs would be protected. Shah’s remarks are significant because they reiterate the project’s strategic importance and reaffirm the Centre’s resolve to implement the dam, while leaving the terms of consultation open. After Shah’s speech, Khandu urged Siang residents in a post on X to listen to Shah’s assurances directly. The Chief Minister said Shah had made clear that the project would move forward only through dialogue and after taking the people of Siang into confidence. On November 20, the Siang Indigenous Farmers’ Forum (SIFF) and the Adi Bane Kebang United sent Shah a joint memorandum seeking cancellation of the project, an immediate halt to pre-feasibility work and a judicial inquiry into the October 23 violence. They also sought the release of protesters still in custody, withdrawal of criminal cases and removal of central security forces from the region. On the night of October 23, clashes broke out in Pasighat, East Siang district, hours after a 12-hour bandh called by groups opposing the dam. A police station, an NHPC office and several police vehicles were set on fire, and the homes of local political leaders were vandalised. Police reported injuries to personnel from stone-pelting and used tear gas to disperse the crowd. Khandu has maintained that the state government is seeking people’s cooperation for a pre-feasibility study. In a November 2 open letter to residents of the Siang belt, particularly members of the local Adi community, he said any decision on construction would require extensive consultation and consent. On November 12, he ruled out the use of force and offered to meet protesters anywhere with experts. Deputy Chief Minister Chowna Mein said he shared Khandu’s position and invited groups opposing the project for talks. On November 9, Arunachal East BJP MP Tapir Gao told students in Tezu that the dam would be built “today or tomorrow”, even if it took another generation. Khandu later said Gao’s remarks had been misinterpreted. Earlier, on October 8, Union Minister and Arunachal West MP Kiren Rijiju had said in Pasighat that a decision would not be imposed on residents and urged dialogue with Adi community leaders. “If we sit down and talk, technically, everything will be clear. We have to talk. We have to move forward,” he said. In an October 29 letter to Union Jal Shakti minister C R Patil, Assam Congress president and Jorhat MP Gaurav Gogoi sought an independent assessment of downstream impacts and prior consultation with Assam and affected communities. He questioned whether the dam could reliably moderate floods and maintain year-round flows in a region prone to extreme rainfall, landslides and glacial lake outbursts. India’s plans to harness the Siang and Subansiri date back to 1982. The Siang gained strategic importance as China advanced its hydropower plans on the Yarlung Tsangpo, as the river is known in Tibet. In 2002, India and China agreed on a mechanism for sharing flood-season hydrological data. A year later, India launched a 50,000-MW hydropower initiative, with about 27,000 MW envisaged in Arunachal Pradesh. India raised concerns about upstream Chinese projects in 2011 and 2013. In 2017, NITI Aayog proposed replacing two planned upper Siang projects with one large storage dam. In December 2024, Beijing approved a 60,000-MW project with five cascade power stations on the lower Yarlung Tsangpo, sharpening concerns in India over downstream flows and sudden releases of water. Opposition to the SUMP came together in August 2025 when Adi clans convened a Bogum Bokang Kebang, or supreme council, at Geku in Upper Siang for the first time in 25 years. The council opposed both the dam and the pre-feasibility studies. The SIFF estimates that the reservoir could submerge 27 villages, affect dozens more and displace between one lakh and 1.5 lakh indigenous people. Villagers fear losing paddy fields, jhum plots, orchards and the livelihoods they sustain. They regard the land as belonging to Abo Tani, their primordial ancestor, and revere the river as Ane Siang, or Mother Siang. For those opposing the dam, submergence would also mean losing places that connect them to their ancestors.
Union Home Minister Amit Shah Reiterates Strategic Importance of Siang Upper Multipurpose Project
Indian Express•

Full News
Share:
Disclaimer: This content has not been generated, created or edited by Achira News.
Publisher: Indian Express
Want to join the conversation?
Download our mobile app to comment, share your thoughts, and interact with other readers.